Web Analytics
top of page
power substation.jpeg

HV, MV & LV Switchgear Design & Installation in Braunstone Town, Leicestershire

Delivering high quality HV, MV and LV switchgear installation and commissioning services to clients throughout Braunstone Town, Leicestershire, Oltec FM brings over 40 years of electrical engineering expertise to every project we undertake. Our specialist power installation teams are equipped to design, install and commission the full range of high voltage, medium voltage and low voltage switchgear, alongside protection and control systems, power distribution transformers, battery systems and all associated cable management. If you are looking for a switchgear contractor you can rely on, our proven track record speaks for itself.

​

☎️ 0800 038 9786
βœ‰οΈ info@oltecgroup.co.uk

​

βœ” Established 40+ years   βœ” Fully accredited

βœ” Nationwide coverage   βœ” 24/7 emergency support

CTA Maintenance NT26.jpg
ppm maintenance.jpeg

Expert HV, MV and LV Switchgear Installation and Commissioning

Oltec Facilities Management provides highly trained and competent engineers to install and commission HV, MV and LV switchgear across a broad spectrum of project types and scales. Our electrical engineering expertise covers Protection and Control Systems, Power Distribution Transformers, Transformer Rectifiers, Battery Systems and all associated cables, cable management systems and ancillary equipment. Operating throughout Braunstone Town, Leicestershire and the wider UK, our specialist teams are experienced in delivering everything from a standard package substation installation through to a full turnkey large-scale switchgear installation and system commissioning project. We understand that no two projects are the same, and our flexible, client-focused approach ensures we can accommodate the specific technical demands of your installation. Whether you are an energy provider, a network operator, an industrial client or a construction contractor, we have the skills, certifications and resource to deliver your HV, MV and LV switchgear project safely, on programme and to the highest standard of quality and compliance.

Specialist Substation Installation Teams Working Nationwide

The delivery of a successful substation installation project depends on the quality and experience of the teams on the ground. At Oltec Facilities Management, our dedicated Power Installation specialists bring years of hands-on experience to every substation, compound, control room and cable run installation they undertake. Working throughout Braunstone Town, Leicestershire and on a nationwide basis, our engineers have extensive knowledge of the full substation build process, including the installation of equipment frameworks and plinths, modular substation units, generator systems and protection panels. We work across a wide range of sectors and project types, from utilities and renewables to industrial and commercial environments, and our teams are fully trained to work safely and efficiently in all of these settings. If your project requires experienced substation electricians who understand the importance of quality, compliance and programme delivery, our Power Installation teams are ready to support you.

electrical 9.png
substation 9.png

Experienced Switchgear Installers and Substation Electricians

Part of what sets Oltec Facilities Management apart from other switchgear contractors is our ability to manage every aspect of the installation process, including specialist lifting operations and plant movement activities. Our teams are fully trained to carry out these activities safely and efficiently, ensuring your project stays on schedule and that all equipment is positioned correctly and without damage. With extensive experience of working with switchgear from many different manufacturers, our installation engineers are comfortable with a wide range of equipment types and configurations. Across Braunstone Town, Leicestershire and the rest of the UK, our substation electricians install cable management systems relevant to the site environment and specification, followed by the installation of all power, control and fibre cabling. Small power and lighting installation completes our scope, meaning clients who choose us benefit from a single contractor capable of delivering the full electrical installation works within their substation or switchroom project.

Contact Our Expert Team Today for β€‹Turnkey Electrical Solutions

The Oltec Group is able to complete entire substation builds under a single contract, providing clients with a streamlined, low-risk approach to electrical installation project management. By consolidating all electrical installation activities - from structural preparation and equipment installation through to cabling, small power and lighting - under one experienced and accountable contractor, clients throughout Braunstone Town, Leicestershire and the UK benefit from improved programme certainty, reduced coordination overhead and a single point of accountability for quality and compliance. Our highly experienced installation teams work across all phases of the substation build, bringing the same high standards to every element of the works. Whether you are managing a complex turnkey HV switchgear project or a more straightforward substation installation, we have the capability and resource to deliver. We encourage you to get in touch with our team to discuss your project requirements, and we will work with you to develop a solution that meets your technical, commercial and programme needs.

ppm-workman-writing-notes.jpg
bottom of page