HV, MV & LV Switchgear Design & Installation in Chipping Norton, Oxfordshire
For expert HV, MV and LV switchgear design and installation in Chipping Norton, Oxfordshire, look no further than The Oltec Group. Our team of highly trained and competent electrical engineers has been delivering switchgear installation, substation commissioning and power distribution solutions for over 40 years. We work across a wide range of sectors and project scales, from package substation installations and modular substations through to full turnkey LV and HV switchgear projects, ensuring your electrical infrastructure is installed, commissioned and performing to specification from day one.
β
βοΈ 0800 038 9786
βοΈ info@oltecgroup.co.uk
β
β Established 40+ years β Fully accredited
β Nationwide coverage β 24/7 emergency support

Expert HV, MV and LV Switchgear Installation and Commissioning
Oltec Facilities Management provides highly trained and competent engineers to install and commission HV, MV and LV switchgear across a broad spectrum of project types and scales. Our electrical engineering expertise covers Protection and Control Systems, Power Distribution Transformers, Transformer Rectifiers, Battery Systems and all associated cables, cable management systems and ancillary equipment. Operating throughout Chipping Norton, Oxfordshire and the wider UK, our specialist teams are experienced in delivering everything from a standard package substation installation through to a full turnkey large-scale switchgear installation and system commissioning project. We understand that no two projects are the same, and our flexible, client-focused approach ensures we can accommodate the specific technical demands of your installation. Whether you are an energy provider, a network operator, an industrial client or a construction contractor, we have the skills, certifications and resource to deliver your HV, MV and LV switchgear project safely, on programme and to the highest standard of quality and compliance.
Specialist Substation Installation Teams Working Nationwide
With dedicated Power Installation teams operating Chipping Norton, Oxfordshire and across the length and breadth of the UK, Oltec FM is one of the most experienced and capable substation installation contractors in the country. Our specialist engineers are fully equipped to fit out electrical substations, compounds, control rooms and cable runs, including the installation of the frameworks and plinths on which primary switchgear and distribution equipment will be mounted. We have extensive experience of working with a wide range of substation types and configurations, including modular substations, and are also experienced in the installation of generators and protection panels where these form part of the wider project scope. Our teams are known for their high standards of workmanship, their commitment to site safety and their ability to adapt to the specific demands of the project environment, making us a trusted partner for substation installation projects of all types and scales.


Experienced Switchgear Installers and Substation Electricians
Part of what sets Oltec FM apart from other switchgear contractors is our ability to manage every aspect of the installation process, including specialist lifting operations and plant movement activities. Our teams are fully trained to carry out these activities safely and efficiently, ensuring your project stays on schedule and that all equipment is positioned correctly and without damage. With extensive experience of working with switchgear from many different manufacturers, our installation engineers are comfortable with a wide range of equipment types and configurations. Across Chipping Norton, Oxfordshire and the rest of the UK, our substation electricians install cable management systems relevant to the site environment and specification, followed by the installation of all power, control and fibre cabling. Small power and lighting installation completes our scope, meaning clients who choose us benefit from a single contractor capable of delivering the full electrical installation works within their substation or switchroom project.
Contact Our Expert Team Today for βTurnkey Electrical Solutions
Our complete substation build capability means that clients working with The Oltec Group can significantly reduce the number of specialist contractors required to deliver their project. From the installation of equipment frameworks and primary HV, MV and LV switchgear through to cable management systems, power and control cabling, fibre cabling, small power and lighting, all works are delivered by our own highly trained and experienced teams. We operate throughout Chipping Norton, Oxfordshire and on a nationwide basis, giving clients the confidence that wherever their project is located, they have access to a capable, experienced and accountable contractor. This integrated approach also benefits programme delivery, as our teams work in close coordination rather than in sequence as separate contractors would. If you are considering a substation build and want to explore the benefits of working with a single, experienced electrical installation contractor, get in touch with us today and our team will be pleased to talk through your project requirements and how we can best support them.