
HV, MV & LV Switchgear Design & Installation in Henley-in-Arden, Warwickshire
Oltec FM is a leading provider of HV, MV and LV switchgear design, installation and commissioning services, supporting clients in Henley-in-Arden, Warwickshire and across the United Kingdom. Backed by over 40 years of hands-on experience in high voltage and low voltage switchgear projects, our fully qualified and competent engineers deliver the complete range of electrical substation installation services. From power distribution transformers and transformer rectifiers through to protection and control systems, battery systems and cable management, we provide a comprehensive switchgear installation solution tailored to your project requirements.
ā
āļø 0800 038 9786
āļø info@oltecgroup.co.uk
ā
ā Established 40+ years ā Fully accredited
ā Nationwide coverage ā 24/7 emergency support

Expert HV, MV and LV Switchgear Installation and Commissioning
When you need experienced HV, MV and LV switchgear engineers, The Oltec Group is ideally placed to support your project. Our highly competent installation and commissioning teams cover Protection and Control Systems, Power Distribution Transformers, Transformer Rectifiers, Battery Systems and the full suite of cable management systems and ancillary equipment, providing clients in Henley-in-Arden, Warwickshire and nationwide with a reliable, single-source switchgear installation solution. We are equally comfortable delivering a standard package substation as we are managing a complex, multi-phase turnkey LV and HV switchgear installation with full system commissioning requirements. With over 40 years of experience in the electrical engineering sector, we understand the importance of precision, compliance and programme adherence on every project we undertake, and we bring that commitment to quality to every installation we deliver, regardless of project size or sector.
Specialist Substation Installation Teams Working Nationwide
Our nationwide network of Power Installation specialists means that wherever your electrical substation project is located, The Oltec Group is able to provide the experienced teams you need to deliver it. From Henley-in-Arden, Warwickshire to the furthest corners of the UK, our engineers fit out electrical substations, compounds, control rooms and cable runs, and are fully experienced in the installation of structural frameworks and plinths to support primary electrical equipment. We are equally adept at delivering modular substation installations, generator integration and protection panel installation, providing a truly flexible service that adapts to the unique requirements of each project. Our substation installation teams work in close coordination with project managers, civil engineers and principal contractors to ensure the installation programme is maintained, and that all works are completed safely and in accordance with the relevant technical specifications and industry standards.


Experienced Switchgear Installers and Substation Electricians
Part of what sets The Oltec Group apart from other switchgear contractors is our ability to manage every aspect of the installation process, including specialist lifting operations and plant movement activities. Our teams are fully trained to carry out these activities safely and efficiently, ensuring your project stays on schedule and that all equipment is positioned correctly and without damage. With extensive experience of working with switchgear from many different manufacturers, our installation engineers are comfortable with a wide range of equipment types and configurations. Across Henley-in-Arden, Warwickshire and the rest of the UK, our substation electricians install cable management systems relevant to the site environment and specification, followed by the installation of all power, control and fibre cabling. Small power and lighting installation completes our scope, meaning clients who choose us benefit from a single contractor capable of delivering the full electrical installation works within their substation or switchroom project.
Contact Our Expert Team Today for āTurnkey Electrical Solutions
Our complete substation build capability means that clients working with The Oltec Group can significantly reduce the number of specialist contractors required to deliver their project. From the installation of equipment frameworks and primary HV, MV and LV switchgear through to cable management systems, power and control cabling, fibre cabling, small power and lighting, all works are delivered by our own highly trained and experienced teams. We operate throughout Henley-in-Arden, Warwickshire and on a nationwide basis, giving clients the confidence that wherever their project is located, they have access to a capable, experienced and accountable contractor. This integrated approach also benefits programme delivery, as our teams work in close coordination rather than in sequence as separate contractors would. If you are considering a substation build and want to explore the benefits of working with a single, experienced electrical installation contractor, get in touch with us today and our team will be pleased to talk through your project requirements and how we can best support them.


