Web Analytics
top of page
power substation.jpeg

HV, MV & LV Switchgear Design & Installation in Stalybridge, Greater Manchester

At Oltec, we are proud to be one of the most trusted names in HV, MV and LV switchgear installation and commissioning across Steyning, West Sussex and beyond. With four decades of experience delivering high voltage switchgear projects, our competent and fully qualified electrical engineers provide end-to-end solutions covering power distribution transformers, protection and control systems, battery systems, cable management and substation installation. From a single package substation through to a complex, multi-site turnkey installation, we bring the experience, technical capability and dedicated resource your project demands.

☎️ 0800 038 9786
✉️ info@oltecgroup.co.uk

Established 40+ years    Fully accredited

 Nationwide coverage    24/7 emergency support

CTA Maintenance NT26.jpg
ppm maintenance.jpeg

Expert HV, MV and LV Switchgear Installation and Commissioning

At Oltec Facilities Management, we deploy highly trained and competent engineers to design, install and commission HV, MV and LV switchgear for clients throughout Steyning, West Sussex and the wider UK. Our installation scope encompasses the full range of primary and secondary equipment, including Protection and Control Systems, Power Distribution Transformers, Transformer Rectifiers, Battery Systems, power and control cabling, fibre cabling and all associated cable management systems and ancillary equipment. Our experience spans the full project spectrum, from standard package substation installations to complex, large-scale turnkey installations requiring full system commissioning. We work closely with clients, main contractors and consulting engineers to ensure the installation process is managed efficiently and that all works are completed in line with the relevant technical standards and safety requirements. Our commitment to quality and our depth of expertise make us the switchgear installation contractor of choice for a wide variety of industries and sectors.

Specialist Substation Installation Teams Working Nationwide

The delivery of a successful substation installation project depends on the quality and experience of the teams on the ground. At Oltec Facilities Management, our dedicated Power Installation specialists bring years of hands-on experience to every substation, compound, control room and cable run installation they undertake. Working throughout Steyning, West Sussex and on a nationwide basis, our engineers have extensive knowledge of the full substation build process, including the installation of equipment frameworks and plinths, modular substation units, generator systems and protection panels. We work across a wide range of sectors and project types, from utilities and renewables to industrial and commercial environments, and our teams are fully trained to work safely and efficiently in all of these settings. If your project requires experienced substation electricians who understand the importance of quality, compliance and programme delivery, our Power Installation teams are ready to support you.

electrical 9.png
substation 9.png

Experienced Switchgear Installers and Substation Electricians

Part of what sets The Oltec Group apart from other switchgear contractors is our ability to manage every aspect of the installation process, including specialist lifting operations and plant movement activities. Our teams are fully trained to carry out these activities safely and efficiently, ensuring your project stays on schedule and that all equipment is positioned correctly and without damage. With extensive experience of working with switchgear from many different manufacturers, our installation engineers are comfortable with a wide range of equipment types and configurations. Across Steyning, West Sussex and the rest of the UK, our substation electricians install cable management systems relevant to the site environment and specification, followed by the installation of all power, control and fibre cabling. Small power and lighting installation completes our scope, meaning clients who choose us benefit from a single contractor capable of delivering the full electrical installation works within their substation or switchroom project.

Contact Our Expert Team Today for Turnkey Electrical Solutions

Oltec Services is able to complete entire substation builds under a single contract, providing clients with a streamlined, low-risk approach to electrical installation project management. By consolidating all electrical installation activities - from structural preparation and equipment installation through to cabling, small power and lighting - under one experienced and accountable contractor, clients throughout Steyning, West Sussex and the UK benefit from improved programme certainty, reduced coordination overhead and a single point of accountability for quality and compliance. Our highly experienced installation teams work across all phases of the substation build, bringing the same high standards to every element of the works. Whether you are managing a complex turnkey HV switchgear project or a more straightforward substation installation, we have the capability and resource to deliver. We encourage you to get in touch with our team to discuss your project requirements, and we will work with you to develop a solution that meets your technical, commercial and programme needs.

ppm-workman-writing-notes.jpg
bottom of page